aboutsummaryrefslogblamecommitdiffstats
path: root/doc/priority.txt
blob: 24768252c6fc579820a1848168e4ad2a0c0406f6 (plain) (tree)
1
2
3
4
5
6
7
8
9


        
                                                                    

                                                                         

                                                                              
 



                                                                               
 

                                                                           
Priority
========

Change the priority of the currently selected item in the todo list.
Priorities are represented by the number appearing in front of the todo
description. This number goes from 9 for the lowest priority to 1 for the
highest priority. Todo items having higher priorities are placed first (at the
top) inside the todo panel.

By default, if you want to raise the priority of a todo item, you need to press
'+'.  In doing so, the number in front of this item will decrease, meaning its
priority increases. The item position inside the todo panel may change,
depending on the priority of the items above it.

At the opposite, to lower a todo priority, press '-'. The todo position may
also change depending on the priority of the items below.